|
|
|
|
|
|
Author:
|
Joan Serrat |
|
Short Description:
|
These deliverable presents the work conducted within WP4 since January 2007 up to March 2008, excluding the impact analysis already presented last June in deliverable D4.3.
The orientation is twofold; in occasions it describes activities that have been undertaken for the first time and ... |
|
|
|
|
|
|
|
Author:
|
Wiktor Procyk, Aiko Prass, Marinos Charalambides and Joan Serrat |
|
Short Description:
|
Deliverable D4.5 is the report of activities conducted within WP4 in the one year period starting March 2008 and ending March 2009. This period is characterized by the maturity reached by our electronic collaboration and dissemination tools. All them are fully functional and used for the conceive... |
|
|
|
|
|
|
|
Author:
|
WP4 Partners |
|
Short Description:
|
Deliverable D4.6 is the report of activities conducted within WP4 in the nine month period starting April 2009 and ending December 2009. In that period the site has continued sowing a stable behavior and only a few incidents appeared that were solved on time. Although almost at the end of the... |
|
|
|
|
|
|
|
Author:
|
Bartosz Gajda and Wiktor Procyk |
|
Short Description:
|
This document presents the usage statistics of both the public and the restricted EMANICS sites for the period 1st April 2009 to 30th March 2010. In both cases we present the activity of the site reflected by the number of visitors, the number of hits and pages visited and the traffic generated |
|
|
|
|
|
|
|
Author:
|
Olivier Festor |
|
Short Description:
|
This document is the final report of the activity undertaken in work-package 5 for training, standardization and technology transfer in the area of device, network and servicemanagement. The document is an updated version of the interim report D5.2, covers the full first 18 month of the EMANICS... |
|
|
|
|
|
|
|
Author:
|
Aiko Pras |
|
Short Description:
|
This document is the interim report of the activities undertaken in work-package 5 within the first nine months of second phase of the project.
In the second phase of EMANICS, the objectives of this WP are:
- To foster active participation of EMANICS members in standardization act... |
|
|
|
|
|
|
|
Author:
|
Aiko Pras |
|
Short Description:
|
This document is the final report of the activity undertaken in work-package 5 for training, standardization and technology transfer in the area of device, network and service management. The document is an updated version of the interim report D5.3, and covers the full first 18 months of the... |
|
|
|
|
|
|
|
Author:
|
WP5 Partners |
|
Short Description:
|
This document is the final report of the activity undertaken in work-package 5 for training, standardization and technology transfer in the area of device, network and service management. The document covers the last full 12 months (36-48) of the EMANICS project. For the other months, please ... |
|